About this agreement
Important Guidelines
Supporting Documents
Documents commonly required when preparing and executing a धारा १४८ सीपीसी ( सीपीसी के अंतर्गत निर्धारित किसी भी कार्य हेतु समय सीमा में वृद्धि का आवेदन ) in Hindi. Exact lists vary by State and receiving authority.
Photo identity proof of parties / deponent
Aadhaar, PAN, passport, voter ID, or driving licence.
When: Always, for identification and KYC.
Address proof
Aadhaar, utility bill, or other accepted address proof.
When: Usually required for notarization / filing.
Supporting title or factual documents
Prior deeds, agreements, notices, court papers, or records relevant to this template.
When: When the document relies on earlier transactions or proceedings.
Passport-size photographs
As required by the notary or filing office.
When: Often for affidavits and certain applications.
Stamp paper (if applicable)
Non-judicial stamp paper of the local required denomination.
When: Where State law requires the instrument on stamp paper.
Frequently asked questions
What is a Section 148 CPC (Application for extension of time limit for any work prescribed under CPC)?→
It is a standard Indian legal application / form template you can customise with parties, dates and particulars, then execute or file as your facts and local practice require.
Is this template valid across India?→
The structure is drafted for Indian legal practice, but stamp duty, registration, court fee and attestation rules are State-specific. Confirm requirements where you will execute or file.
Do I need a lawyer to use this template?→
It is a strong starting point. For disputed, high-value or complex matters, have a qualified Indian advocate review the completed draft before signing.
Can I edit the wording?→
Yes—adapt particulars to your facts. Do not delete operative legal clauses without advice, as that can weaken enforceability.
What stamp paper value should I use?→
Stamp duty depends on the document type and your State. Check the local stamp schedule or ask a stamp vendor / advocate before printing.
Why use the Hindi edition?→
The Hindi edition helps local parties, staff and counsel work in the language of execution while keeping the same Indian contractual structure. You can still take English advice in parallel where needed.
